ENTSO-E releases report on grid incident in South-East Europe in June 2024

Power grid association and GO15 partner ENTSO-E has released an interim factual report on the grid incident that occurred in South-Eastern Europe on June 21st, 2024.

This incident led to a major disruption in the power system of Continental Europe (CE) and resulted in a substantial loss of the capacity of supplying power. It mainly affected Albania (OST), Bosnia and Herzegovina (NOSBiH), Montenegro (CGES), and Croatia (HOPS).

The report focuses on:

  • System and market conditions before the incident
  • Evolution of system conditions during the event
  • RCC analysis before the incident
  • Communication of coordination centres/SAM and between TSOs
  • Restoration process
  • Classification of the incident based on the ICS methodology
  • Next steps